ÂÌñÉç

View or comment on traffic orders

Current temporary orders TTROs

The listed orders may relate to

  • ongoing works on the road 
  • events 
  • emergency situations

where the Council has decided that temporary measures are required to manage how the road is used.

Below you will find all TTROs relating to road works, events etc. 

Please note that some of our downloads might not be accessible. If you need help please contact us on  temporarytrafficregulationorders@edinburgh.gov.uk 

Order number Location Effect Reason Start date End date View order Contact
TEMP/19/210 Edinburgh Tram Network Various To facilitate the utilities diversions and realted works required in connection with the Edinburgh Tram Network 16 November 2019 Until revoked Download TEMP/19/210 Newhaven.Tram@edinburgh.gov.uk
TEMP/21/65 Guthrie Street Loading prohibiton To facilitate new hotel construction 13 May 2021 Until revoked Download TEMP/21/65 Lewis.Innes@edinburgh.gov.uk
TEMP/21/194 Inverleith Place Waiting, loading & unloading. To facilitate access works to Royal Botanic Gardens 29 November 2021 Until revoked Download TEMP/21/194
TEMP/23/142 Tarvit Street Area Road closures, one-way roads, and waiting, loading & unloading To facilitate a safe working area for the refurbishment of the King's Theatre 19 June 2023 Until revoked Download TEMP/23/142 Lewis.Innes@edinburgh.gov.uk
TEMP/23/212 Devon Place Prohibition of motor vehicles, and waiting, loading & unloading To facilitate a site compound 24 October 2023 Until revoked Download TEMP/23/212 Lewis.Innes@edinburgh.gov.uk
TEMP/23/242 Grassmarket, North Section Suspension of prohibition of motor vehicles To facilitate public safety and to allow Grassmarket Market vehicles to load up and exit the Grassmarket pedestrian precinct area 4 November 2023 15 March 2025 Download TEMP/23/242 John.Murphy@edinburgh.gov.uk
TEMP/23/243 Abbey Lane & Abbeyhill/Spring Gardens (No. 2) Road closures, and waiting, loading & unloading To facilitate a safe working area for nearby redevelopment works 9 January 2024 30 June 2025 Download TEMP/23/243 Peter.Fawcett@edinburgh.gov.uk
TEMP/23/244 West Approach Road Suspension of weight limit for specified vehicles To facilitate activities directly related to the Roseburn to Union Canal project 6 November 2023 5 November 2024 Download TEMP/23/244 Barry.Clarke@edinburgh.gov.uk
TEMP/23/255 Portobello High Street Weight limit  To facilitate public safety 1 January 2024 Until revoked Download TEMP/23/255 Dave.Sinclair@edinburgh.gov.uk
TEMP/24/06 Warrender Park Terrace Waiting, loading & unloading To facilitate the installation of a new sewer 8 March 2024 31 December 2024 Download TEMP/24/06 Derek.Roden@edinburgh.gov.uk
TEMP/24/22 Fountainbridge Waiting, loading & unloading, and suspension of Greenways & Map based order To facilitate a safe working area for external fabric and drainage repair works 6 February 2024 19 November 2024 Download TEMP/24/22 Jack.McManus@edinburgh.gov.uk
TEMP/24/42 Melville Street Area Road closures, and waiting, loading & unloading To facilitate carriageway and footway reconstruction works 8 April 2024 20 December 2024 Download TEMP/24/42 Rurigdh.McMeddes@edinburgh.gov.uk
TEMP/24/43 Mayfield Road Road closure To facilitate a safe loading area for the adjacent construction site 1 May 2024 31 December 2024 Download TEMP/24/43 Derek.Roden@edinburgh.gov.uk
TEMP/24/46 Newhaven Cruiseliner Visits Waiting, loading & unloading To facilitate cruise liner visits 1 April 2024 27 September 2024 Download TEMP/24/46 John.Murphy@edinburgh.gov.uk
TEMP/24/48 Marlborough Street & Regent Street, Portobello Area Waiting, loading & unloading To facilitate the safe movement of public transport, emergency vehicles and refuse vehicles 15 March 2024 14 September 2025 Download TEMP/24/48 Patrick.Coogan@edinburgh.gov.uk
TEMP/24/53 Castlehill Road closure and waiting To facilitate Tattoo Stands installation works 29 April 2024 21 October 2024 Download TEMP/24/53 Robert.Dickson@edinburgh.gov.uk
TEMP/24/58 South Queensferry Cruiseliner visits Waiting, loading & unloading To facilitate cruise liner visits 30 April 2024 3 October 2024 Download TEMP/24/58 John.Murphy@edinburgh.gov.uk
TEMP/24/61 Woodhall Bank Area Road closure, and waiting, loading & unloading To facilitate footway reconstruction work 27 May 2024 4 October 2024 Download TEMP/24/61 Gary.Elliot@edinburgh.gov.uk
TEMP/24/70 Craighall Avenue Waiting, loading & unloading To facilitate a safe working area for building construction works 20 May 2024 19 November 2025 Download TEMP/24/70 Richard.Denney@edinburgh.gov.uk
TEMP/24/76 Bingham Avenue Road Closure To facilitate carriageway resurfacing works 19 August 2024 25 October 2024 Download TEMP/24/76 William.Kearns@edinburgh.gov.uk
TEMP/24/78 Inverleith Place Waiting, loading & unloading To facilitate a safe working area for SGN mains replacement works 17 June 2024 17 October 2024 Download TEMP/24/78 Richard.Denney@edinburgh.gov.uk
TEMP/24/79 Portobello / Shrubhill Areas Road closures, and waiting, loading & unloading To facilitate a safe working area for SPEN joint bay works 3 June 2024 15 December 2024 Download TEMP/24/79 Peter.Fawcett@edinburgh.gov.uk
TEMP/24/81 Walter Scott Avenue Area Road closures, and waiting, loading & unloading To facilitate footway resurfacing works 10 June 2024 30 September 2024 Download TEMP/24/81 Calum.McQueen@edinburgh.gov.uk

TEMP/24/88

Long Dalmahoy Road Area, Balerno Road closures, and waiting, loading & unloading To facilitate carriageway strengthening works 29 July 2024 22 September 2024 Download TEMP/24/88 Martin.Watson@edinburgh.gov.uk
TEMP/24/89 Marchmont Crescent (southern section) Road closure, and waiting, loading & unloading To facilitate sewer installation works 5 August 2024 20 December 2024 Download TEMP/24/89 Derek.Roden@edinburgh.gov.uk
TEMP/24/97 Lanark Road Area Road closures, and waiting, loading & unloading To facilitate carriageway resurfacing works 16 September 2024 10 November 2024 Download TEMP/24/97 Alan.Parkinson@edinburgh.gov.uk
TEMP/24/98 George Square Festival Road closure, prohibition of motor vehicles, one-way roads, and waiting, loading & unloading To facilitate fringe events being held on George Square 24 June 2024 4 September 2024 Download TEMP/24/98 John.Murphy@edinburgh.gov.uk
TEMP/24/101 Craigs Road Road closure, and waiting, loading & unloading To facilitate carriageway resurfacing works 1 July 2024 31 March 2025 Download TEMP/24/101 Peter.Fawcett@edinburgh.gov.uk
TEMP/24/107 Shrubhill Walk Waiting, loading & unloading To facilitate construction works 14 June 2024 13 June 2025 Download TEMP/24/107 Robert.Armstrong@edinburgh.gov.uk
TEMP/24/109 South St David Street Area Road closures, prohibition of turning, and waiting, loading & unloading To facilitate works relating to the redevelopment of Jenners and the temporary relocation of the Airport Bus Terminus 24 June 2024 23 December 2025 Download TEMP/24/109 Lewis.Innes@edinburgh.gov.uk
TEMP/24/115 Bellfield Street, Portobello Road closure, and waiting, loading & unloading To facilitate a safe working area for the removal of the asbestos roof on Portobello Swim Centre 15 July 2024 31 January 2025 Download TEMP/24/115 Peter.Fawcett@edinburgh.gov.uk
TEMP/24/118 Strathearn Road Area Road closure, one-way roads, and waiting, loading & unloading To facilitate SGN mains renewal works 15 July 2024 25 October 2024 Download TEMP/24/118 Derek.Roden@edinburgh.gov.uk
TEMP/24/124 Meadowhouse Road Road closure and waiting, loading & unloading To facilitate sewer repair works 20 August 2024 15 September 2024 Download TEMP/24/124 Richard.Denney@edinburgh.gov.uk
TEMP/24/126 Walter Scott Avenue Area Road closures, and waiting, loading & unloading To facilitate footway resurfacing works 29 July 2024 30 October 2024 Download TEMP/24/126 Calum.McQueen@edinburgh.gov.uk
TEMP/24/128 Longstone Road Area Road closures, and waiting, loading & unloading To facilitate a safe working area for Scottish Water lead repair works 24 July 2024 30 September 2024 Download TEMP/24/128 Peter.Fawcett@edinburgh.gov.uk
TEMP/24/136 Fly Music Festival Prohibition of motor vehicles, prohibition of pedestrians, and waiting, loading & unloading To facilitate the holding of Fly Music Festival 16 September 2024 25 September 2024 Download TEMP/24/136 John.Murphy@edinburgh.gov.uk
TEMP/24/137 Glasgow Road(A8) Road closure, and waiting, loading & unloading To facilitate carriageway resurfacing and drainage improvement works 2 September 2024 1 November 2024 Download TEMP/24/137 Stylianos.Kapetanakis@edinburgh.gov.uk
TEMP/24/139 Orchard Drive Area Road closure, one-way road, and waiting, loading & unloading To facilitate swale construction and sustainable drainage infrastructure works 29 August 2024 28 November 2024 Download TEMP/24/139 Stephen.Knox@edinburgh.gov.uk
TEMP/24/142 Lasswade Road Area Road closures, and waiting, loading & unloading To facilitate carriageway resurfacing and segregated cycle lane installation works 27 July 2024 23 December 2024 Download TEMP/24/142 Raymond.Preston@edinburgh.gov.uk
TEMP/24/146 Newcraighall Road/Niddrie Mains Road area Road closure, waiting, loading & unloading To facilitate carriageway resurfacing and drainage improvement works 2 September 2024 20 December 2024 Download TEMP/24/146 William.Kearns@edinburgh.gov.uk
TEMP/24/147 Clermiston Drive Area Road closures, and waiting, loading & unloading To facilitate carriageway strengthening and resurfacing works 26 August 2024 4 October 2024 Download TEMP/24/147 Steven.Peacock@edinburgh.gov.uk
TEMP/24/148 Cumberland Street Wating, loading & unloading To facilitate a safe working area for Scottish Power joint bay works 3 September 2024 14 September 2024 Download TEMP/24/148 Jack.McManus@edinburgh.gov.uk
TEMP/24/149 Rose Street North Lane Road closure, and waiting, loading & unloading To facilitate a safe working area for Scottish Water excavation and CCTV inspection works 2 September 2024 27 September 2024 Download TEMP/24/149 Richard.Denney@edinburgh.gov.uk
TEMP/24/150 Portland Street Waiting, loading & unloading To facilitate a safe working area for SPEN cabling / joint bay works 26 August 2024 29 September 2024 Download TEMP/24/150 Peter.Fawcett@edinburgh.gov.uk
TEMP/24/151 Baltic Street Waiting, loading & unloading To facilitate a safe working area for SGN infrastructure disconnection works 26 August 2024 15 September 2024 Download TEMP/24/151 Peter.Fawcett@edinburgh.gov.uk
TEMP/24/152 West Approach Road (No. 2) Road closure To facilitate bridge structural repair works 2 September 2024 14 October 2024  Download TEMP/24/152 Blair.Cooney@edinburgh.gov.uk
TEMP/24/153 R2UC Scheme Road closure, and prohibition of pedestrians To facilitate a safe working area for works on Telfer Subway 2 Septemeber 2024 3 October 2024 Download TEMP/24/153 Barry.Clarke@edinburgh.gov.uk
TEMP/24/156 Gorgie Road (No.2) Waiting, loading & unloading To facilitate a safe working area for SPEN joint works 5 September 2024 29 September 2024 Download TEMP/24/156 Richard.Denney@edinburgh.gov.uk
TEMP/24/157 Dudley Avenue Waiting, loading & unloading To facilitate a safe working area for Scottish Water sewer repair works 13 September 2024 6 October 2024 Download TEMP/24/157 Richard.Denney@edinburgh.gov.uk
TEMP/24/160 Carubber's Close Prohibition of pedestrians To facilitate the installation of a scaffold and hoist for adjacent development works 13 September 2024 12 March 2025 Download TEMP/24/160 Jack.McManus@edinburgh.gov.uk
TEMP/24/161 Craiglockhart Road Road closure, and waiting, loading & unloading To facilitate a safe working area for Scottish Water excavation and connection installation works 9 September 2024 6 October 2024 Download TEMP/24/161 Richard.Denney@edinburgh.gov.uk
TEMP/24/162 Lanark Road Waiting, loading & unloading To facilitate a safe working area for SPEN utility works 10 September 2024 3 October 2024 Download TEMP/24/162 Richard.Denney@edinburgh.gov.uk
TEMP/24/164 Prodigal Father Filming Road closures, prohibition of pedestrians, and waiting, loading & unloading To facilitate the holding of Prodigal Father filming 4 September 2024 17 September 2024 Download TEMP/24/164 Andy.Smith@edinburgh.gov.uk
TEMP/24/165 Hibernian FC 2024 / 25 Road closures, restriciton of waiting, and waiting, loading & unloading To facilitate public safety and the safe ingress/egress of spectators during Hibernian FC fixtures being held at Easter Road Stadium, Edinburgh 24 August 2024 12 April 2025 Download TEMP/24/165
TEMP/24/171 West Approach Road (No.3) One way roads To facilitate bridge structural repair works 2 September 2024 21 September 2024 Download TEMP/24/171 Blair.Cooney@edinburgh.gov.uk
TEMP/24/181 Riding of the Marches Prohibition of motor vehicles, One-way roads, and waiting, loading & unloading To facilitate public safety during the Riding of the Marches event 15 September only - Download TEMP/24/181 Andrea.Cornet@edinburgh.gov.uk

Traffic orders general enquiries

For comments or objections to advertised orders

Address: Traffic Orders
3.3 Waverley Court
4 East Market Street
Edinburgh
EH8 8BG